
Construction Manager, Data Center Construction
Salary
$111k–$186k/ annually
Application completed on Amazon
About This Role
AWS Infrastructure Services owns the design, planning, delivery, and operation
of all AWS global infrastructure. In other words, we’re the people who keep the
cloud running. We support all AWS data centers and all of the servers, storage,
networking, power, and cooling equipment that ensure our customers have
continual access to the innovation they rely on. We work on the most challenging
problems, with thousands of variables impacting the supply chain — and we’re
looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply
chain specialists, security experts, operations managers, and other vital roles.
You’ll collaborate with people across AWS to help us deliver the highest
standards for safety and security while providing seemingly infinite capacity at
the lowest possible cost for our customers. And you’ll experience an inclusive
culture that welcomes bold ideas and empowers you to own them to completion.
As our Data Center Construction Manager (CM), you will be a part of a diverse,
upbeat, and creative team tasked with solving fascinating problems constructing
Amazon Data Centers. Our data centers are industry-leading examples of energy
efficient and cost-effective designs.
You will:
• Own project scope, quality, schedule, and budget for construction of new
builds or general capital projects.
• Own construction project management and oversight of construction related
activities.
• Work alongside partner teams such as Operations, Networking, Controls,
Security, and Commissioning to build Data Centers that directly support our
Customers.
• Be a leader in your specific discipline (construction management, building
services, architectural, electrical or mechanical engineering).
• Represent Amazon’s owner’s representative on construction sites daily, as,
interacting with construction trades.
At Amazon, we are all Owners and leverage unique opportunities presented to us
by owning everything from the design review to construction bidding, execution,
and final hand-off to our customers. We develop innovative data centers for our
Customers.
Key job responsibilities
• Be Amazon’s construction representative on multiple data centers building and
capital improvement construction project sites from construction start through
hand-off to operations.
• Direct interface with construction general contractors during the construction
bidding, award, execution, punch-list, and closeout phases.
• Create construction project scope and request for proposals.
• Conduct negotiations with general contractors and evaluate bids and proposals
with detail and accuracy.
• Manage and drive cost, schedule, and quality while managing construction
contractors and vendors.
• Perform construction project management activities, including management of
documents, submittals, RFIs, change orders, invoices, quality, scope, and
schedule.
• Drive construction teams to troubleshoot and perform root-cause failure
analysis on equipment failures.
• Support commissioning and integrated system testing and oversight.
• Support operations of installed facilities, including review of procedures,
best practices, and maintenance initiatives.
• Support capital request creation.
• Analyze and report construction progress and financials.
• Record and report key construction metrics to team members and management.
• Contribute to construction initiatives aimed at improving construction
efficiency and increasing data center resiliency.
• Provide constructability reviews for electrical and mechanical designs for new
or optimization of existing data centers.
About the team
Why AWS
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted
cloud platform. We pioneered cloud computing and never stopped innovating —
that’s why customers from the most successful startups to Global 500 companies
trust our robust suite of products and services to power their businesses.
Work/Life Balance
We value work-life harmony. Achieving success at work should never come at the
expense of sacrifices at home, which is why we strive for flexibility as part of
our working culture. When we feel supported in the workplace and at home,
there’s nothing we can’t achieve in the cloud.
Inclusive Team Culture
Here at AWS, it’s in our nature to learn and be curious. Our employee-led
affinity groups foster a culture of inclusion that empower us to be proud of our
differences. Ongoing events and learning experiences, including our
Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity)
conferences, inspire us to never stop embracing our uniqueness.
Mentorship and Career Growth
We’re continuously raising our performance bar as we strive to become Earth’s
Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and
other career-advancing resources here to help you develop into a better-rounded
professional.
Basic Qualifications: - Bachelor's degree in Electrical Engineering, Mechanical
Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and
into deployment or mass production
- Experience in MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems Preferred
Qualifications: - 5+ years of project management in data centers or comparable
critical infrastructure experience
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams and standard
operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA,
NEC, or OSHA
- Experience in project management in data centers or comparable critical
infrastructure
- Experience in Data Center Engineering Operations, with a deep understanding of
electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings
for all domains
Amazon is an equal opportunity employer and does not discriminate on the basis
of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our
customers. If you have a disability and need a workplace accommodation or
adjustment during the application and hiring process, including support for the
interview or onboarding process, please visit
https://amazon.jobs/content/en/how-we-hire/accommodations
[https://amazon.jobs/content/en/how-we-hire/accommodations] for more
information. If the country/region you’re applying in isn’t listed, please
contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package
will include sign-on payments and restricted stock units (RSUs). Final
compensation will be determined based on factors including experience,
qualifications, and location. Amazon also offers comprehensive benefits
including health insurance (medical, dental, vision, prescription, Basic Life &
AD&D insurance and option for Supplemental life plans, EAP, Mental Health
Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy
Reimbursement coverage), 401(k) matching, paid time off, and parental leave.
Learn more about our benefits at https://amazon.jobs/en/benefits
[https://amazon.jobs/en/benefits].
USA, IN, New Carlisle - 111,300.00 - 186,100.00 USD annually
