Site Lead - Datacenter Construction, Thermal & AC Power - El Paso
Application completed on Vertiv
About This Role
The Site Leader will provide world class jobsite leadership for large,
long-duration, high-profile projects for Vertiv power and/or thermal equipment.
The Site Leader is the primary Vertiv Service on-site technical representative
for large jobs, from construction start, through start-up, site acceptance
testing, and project completion. The Site Leader is required to establish, grow
and maintain excellent rapport with all customers, co-workers, sales
representatives and others as appropriate. The Site Lead is required to work in
tandem with the assigned Project Manager to drive cost controls, schedule
adherence, resource management, and ultimately a positive customer experience.
DUTIES & RESPONSIBILITIES:
ROLE SUMMARY
* Provide jobsite construction and technical leadership for large projects
* Working knowledge of critical infrastructure equipment in data centers,
including Vertiv-manufactured equipment
* Leads a multi-disciplinary on-site team consisting of Project Leaders,
Installers, Technicians, Customer Engineers, and subcontractors
* Represents Vertiv at daily customer meetings and can speak to technical
requirements for the day’s schedule to coordinate activity with other parties
on-site
* Leads and supports start-up and site testing activities for assigned projects
* Ensure sufficient manpower on-site each day to perform start-up and site
testing work
* Assist during start-up and site testing as necessary, depending upon
man-power availability and site location
* Provide daily status reports to Service Management, Project Management and
sales rep
TECHNICAL RESPONSIBILITIES
* Keeps current on Vertiv equipment start-up and commissioning processes,
procedures, and tools-of-the-trade
* Keeps current on Safety Bulletins, Safety Field Change Notices, Field Change
Notices, and Service Tips
SAFETY RESPONSIBILITIES
* Leads daily Vertiv toolbox talk, pre-job safety walk and inspection, and
drives any necessary corrective/preventative actions required in a timely
fashion
* Responsible for the adherence and administration of all site and Vertiv
Safety policies on job sites
* Operates in a safe manner in accordance with published safety guidelines
* Must wear appropriate PPE as per company guidelines and accordance with job
duties
* Adhere to work hours policy guidelines – “14 hours rule”
* Report all work related accidents or injuries within 24 hours to the
appropriate personnel
* Must be a role model to fellow associates with regards to safety by setting a
positive example
* Lead by example with the use of STOP WORK Authority, Good Catch engagement,
and timely closure of necessary corrective/preventative actions
ADMINISTRATIVE RESPONSIBILITIES
* Ensure adherence to Vertiv Warranty process in partnership with Project
Manager
* Provide accurate and timely reporting in accordance with published guidelines
* Timecards, expense reports, mileage reports, SR/task closure, forms, et al.
* Supports Project Manager with obtaining any necessary technical data so
Project Manager can maintain project systems
* Maintain company property according to company policies
* Credit cards, PPE, test equipment, laptop, smartphone, et al.
CUSTOMER SATISFACTION RESPONSIBILITIES
* Provide proper and adequate communication to internal and external customers
* Ensure daily alignment of customer expectations and Vertiv activity, and
drive clarification/re-alignment if there appears to be misalignment of
expectations
* Maintain customer satisfaction rates according to company guidelines
PERSONAL PERFORMANCE EXPECTATIONS
* Make decisions based on the Fundamental 5 in order of importance: Safety,
Quality, Timeliness, Cost, Productivity
* Capable of making timely decisions, technical and commercial, under pressure
* Maintain productive utilization rate according to company guidelines
* Adhere to company dress code and safety regulations
* Understand and comply with company startup/escalation process and procedures
* In all aspects of job requirements, must lead by example, and conduct
themselves aligned to Vertiv Behaviors
* Ability to communicate with all levels within the organization -Managers,
co-workers, Support Services, sales, electronic communications, et al.
* Ability to handle stressful situations and provide a calming effect to
customer
* High level of diplomacy when interacting with internal and external customers
QUALIFICATIONS:
* Experience (one or more of the following)
* ASEET or ASMET preferred
* Equivalent industry experience, specifically leading and actively
participating in start-up and commissioning of power and/or hvac equipment
preferred
* Six years military experience in a related field
* Minimum 2 years of experience in Industrial construction management
* Interpersonal Skills
* Vertiv Behavior practitioner
* Strong organizational skills
* Independent operator
* Strong verbal and written communication skills
* Able to build and maintain trusting customer relationships
* Collaborative and cooperative in high-stress environments
* Able to communicate at all levels of an organization with a base level of
executive presence
* Able to quickly respond to changing customer priorities without disruption
or resistance
* Must be able to read and interpret electrical one-line diagrams and
blueprints
* In all aspects of the job, need to lead by example, and held to a higher
standard of conduct
* Product certifications up to date
* Meet all aspects of the job description
* Performance evaluation rating of meets all aspects of job requirement or
better
* Consistent performance and customer relation skills
* Technical skills
* Ability to make an immediate site evaluation, skills to include:
environmental temperature, and general operating conditions without
supervision
* Ability to summarize and report all work related tasks performed
* Independently evaluate, recognize and recommend acceptable customer
solutions based upon site evaluation
* Recommend and direct activities at a customer site by leading technical
activities of other technicians
* Provide on-site customer consultation with the assistance of Project
Leader(s)
* Capable of providing project leadership and on-site direction for assigned
projects
* Expert in COHE procedures
* Expert in site acceptance testing procedures and equipment
* Computer skills
* Advanced word processing, report generation
* Spreadsheet processing
* Electronic mail
* Test equipment and data analysis programs
* Familiarity with computer networks
* Mechanical aptitude
WORKING CONDITIONS:
* Job assignments will typically be long-term assignments ranging from 4 weeks
to 12+ months duration based upon the scope and schedule of the project
* If assigned a project not located in the vicinity of Site Leader residence,
travel will consist of a field rotation that includes (3) consecutive weeks
on the customer site followed by (1) week of a service break in their home
office whereby the Site Leader is expected to work their minimum of 40 hours
on billable tasks and any administrative duties (i.e. Safety training, cycle
counts, etc.) as necessary
* Jobsites consisting of industrial new construction (greens field) or retrofit
construction (browns field)
* Flexible schedules (weekends, evenings, and holidays)
* Valid driver’s license
* Deployable in the event of emergencies
PHYSICAL REQUIREMENTS:
While performing duties of the above jobs, the associate is regularly required
to stand, walk, use hands and fingers, handle or feel objects, tools or other
components; reach with hands and arms; stoop, kneel, crouch, or crawl; talk,
hear and smell. The associate frequently is required to sit and climb or
balance. Specific vision abilities required by this job include close vision,
distant vision, color vision, peripheral vision, depth perception, and the
ability to adjust focus. Must be able to consistently lift up to 50 pounds and
occasionally up to 75 pounds.
Notes: Vertiv will make reasonable accommodations whenever necessary for all
qualified employees or candidates with disabilities (as defined by applicable
law), provided that (1) the individual is otherwise qualified to safely perform
the essential functions of the job and (2) such accommodations due not impose an
undue hardship.
Due to the safety sensitive aspect of the role, candidates are required to
successfully pass a drug test prior to employment. In addition, you will also be
required to complete and pass a pre-employment background check.
The successful candidate will embrace Vertiv’s Core Principals & Behaviors to
help execute our Strategic Priorities.
OUR CORE PRINCIPALS: Safety. Integrity. Respect. Teamwork. Diversity &
Inclusion.
OUR STRATEGIC PRIORITIES
* Customer Focus
* Operational Excellence
* High-Performance Culture
* Innovation
* Financial Strength
OUR BEHAVIORS
* Own It
* Act With Urgency
* Foster a Customer-First Mindset
* Think Big and Execute
* Lead by Example
* Drive Continuous Improvement
* Learn and Seek Out Development
#LI-HR1
The successful candidate will embrace Vertiv’s Core Principles & Behaviors to
help execute our Strategic Priorities.
OUR CORE PRINCIPLES: Safety. Integrity. Respect. Teamwork. Inclusion.
OUR STRATEGIC PRIORITIES
• High-Performance Culture
• Customer Focus
• Operational Excellence
• Innovation
• Financial Strength
VERTIV BEHAVIORS
• Own it
• Act with urgency
• Foster a customer-first mindset
• Think big and execute
• Lead by example
• Drive continuous improvement
• Learn and seek out development
• Promote transparent & open communication
About Vertiv
Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing
services to enable its customers’ vital applications to run continuously,
perform optimally and grow with their business needs. Vertiv solves the most
important challenges facing today’s data centers, communication networks, and
commercial and industrial facilities with a portfolio of power, cooling and IT
infrastructure solutions and services that extend from the cloud to the edge of
the network. Headquartered in Westerville, Ohio, USA, Vertiv employs around
34,000 people and does business in more than 130 countries. Visit Vertiv.com to
learn more.
Work Authorization
No calls or agencies please. Vertiv will only employ those who are legally
authorized to work in the United States. This is not a position for which
sponsorship will be provided. Individuals with temporary visas such as E, F-1,
H-1, H-2, L, B, J, or TN or who need sponsorship for work authorization now or
in the future, are not eligible for hire.
Equal Opportunity Employer
Vertiv is an Equal Opportunity/Affirmative Action employer. We promote equal
opportunities for all with respect to hiring, terms of employment, mobility,
training, compensation, and occupational health, without discrimination as to
age, race, color, religion, creed, sex, pregnancy status (including childbirth,
breastfeeding, or related medical conditions), marital status, sexual
orientation, gender identity / expression (including transgender status or
sexual stereotypes), genetic information, citizenship status, national origin,
protected veteran status, political affiliation, or disability. If you have a
disability and are having difficulty accessing or using this website to apply
for a position, you can request help by sending an email to help.join@vertiv.com
[help.join@vertiv.com]
Required Skills
Related Jobs

Director of Data Center Operations - Euroope
Cirrascale Cloud Services · (Remote OK)

Vice President Delivery Data Center Infrastructure North America
Nscale · Amersfoort, Utrecht
$260k–$450k / annually
Datacenter Site Leader + Thermal + AC Power - Meridian MS
Vertiv · Meridian, Mississippi