Project Leader - Datacenter Construction, Thermal & Power - Phoenix, AZ
Application completed on Vertiv
About This Role
The Project Leader will provide world class start-up leadership for large,
high-profile orders of Liebert power equipment. The PL is the primary Vertiv
Service representative for large jobs, from factory testing, through start-up,
site acceptance testing, and project completion. The PL is required to
establish, promote and maintain excellent rapport with all customers,
co-workers, sales representatives and others as appropriate. The PL is also
required to maintain continuous communication with CRC, Area/District Offices,
and Area Managers.
DUTIES & RESPONSIBILITIES:
ROLE
* Relies on extensive experience and judgment to plan and accomplish work
related goals
* Requires no direct supervision
* Leads and directs the work of others
* Provides guidance to others on complicated situations
* Factory certified on a variety of products that interact with Liebert
systems:
* Expert working knowledge of Electrical Power Distribution, Generators,
Switchgear, Automatic Transfer Switches, et al.
* Represent Service at all post-sale, customer and contractor meetings for
projects which the PL is assigned to by the Area Manager
* Coordinate start-up and site testing activities for assigned projects before
it begins
* Review site testing requirements and service items provided on the sales
order
* Review customer or third-party test procedures, match to what was sold with
the order
* Assist and recommend man-power needs for the job
* Gather all documentation for job (submittals, as-built drawings, in-house
test procedures)
* Tag equipment and open start-up & site testing tickets
* Initiate SFA requests for custom made test procedures, when provided by
Vertiv Service and sold with the equipment
* Attend Factory Witness Testing for assigned projects, represent Service in
front of the customer, contractor, and consultant
* Assist contractors as required during installation of assigned projects
* Coordinate Pre-Site meetings with contractor
* Visit site on regular basis as agreed upon, typically once per week for
large jobs
* Provide phone support to contractor for technical questions during
installation
* Support start-up and site testing activities for assigned projects
* Ensure sufficient man-power on site each day to perform start-up and site
testing work
* Assist during start-up and site testing as necessary, depending upon
man-power availability and site location
* Provide first level of tech support assistance to speed up problem
resolution
* Arrange proper test equipment and heavy equipment (such as load banks),
ensure all is on site at the times required
* Monitor start-ups for timely completion, work with sales rep and District
Manager on providing quotes for additional services not paid for, or excess
labor requirements resulting from delays beyond Service control
* Provide daily status reports to Service management and sales rep
* Support District Offices, or Power Technical Support, as requested even for
projects not directly assigned to by the Area Manager
* Assist or coordinate PM's for large customers, as requested by District
Manager
* Provide phone or on-site support for remedial services calls
* Provide a first line of high-level technical support on-site for critical
customer problem resolutions
* International start-up or support as requested by Power Technical Support
or Field Management
TECHNICAL
* Provide On-the-Job training and on-site direction to associates for assigned
projects
* Conduct field customer training for assigned projects as required
* Communicate with National Technical Support on equipment issues
* Keep current on Safety Bulletins, Safety Field Change Notices, Field Change
Notices, and Service Tips
SAFETY
* Operate in a safe manner in accordance with published safety guidelines
* Must wear appropriate PPE as per company guidelines and accordance with job
duties
* Adhere to work hours policy guidelines – “14 hours rule”
* Report all work related accidents or injuries within 24 hours to the
appropriate personnel
* Must be a role model to fellow associates with regards to safety by setting
a positive example
* Point out potentially unsafe conditions to a customer or contractor, as
necessary and based on extensive experience, with the authority to halt
work on a project until conditions are corrected
ADMINISTRATION
* Coordinate assigned project completion, customer training, and close-out
* Provide all test data and start-up reports in a final package to the
customer
* Coordinate any additional training bought with the sales order, provided
either by the Customer Engineer, Power Tech Support, or the Project Leader
directly
* Provide Time and Material quotes for customers or contractors for assigned
projects, as necessary
* Coordinate subcontracted services and equipment rentals for assigned
projects, provide purchase orders to vendors as required
* Gather all Service revenue (sales order and any additional PO's) & costs
(labor, equipment, and subcontracted) for assigned projects and report to
Power Technical Support for regular profit/loss reports to Service management
* Review and process submittal drawings
* Log all technical support telephone calls
* Provide accurate and timely reporting in accordance with published guidelines
* Time cards, expense reports, mileage reports, ticket closure, forms, et al.
* Maintain company property according to company policies
* Vehicle, credit cards, PPE, test equipment, laptop, pager, et al.
CUSTOMER SATISFACTION
* Provide proper and adequate communication to internal and external customers
* Provide estimated time of arrival to the customer or contractor where
applicable
* Coordinate and attend customer or contractor meetings as required
* Maintain customer satisfaction rates according to company guidelines
PERFORMANCE
* Complete all work in an efficient and timely manner
* Capable of making strong decisions, technical and commercial, under
pressure
* Properly evaluate site and equipment for appropriate billing status
* Maintain productive utilization rate according to company guidelines
* Adhere to company dress code and safety regulations
* Understand and comply with company startup/escalation process and
procedures
* In all aspects of job requirements, must lead by example, and conduct
themselves in a higher standard. Must act and perform as a role model to
all field associates
* Maintain proper and adequate level of internal communications
* Ability to communicate with all levels within the organization -Managers,
co-workers, Support Services, sales, electronic communications, et al.
* Conduct themselves in a high degree of professionalism, and of service
delivery
* Ability to handle stressful situations and provide a calming effect to
customer
* High level of diplomacy when interacting with internal and external
customers
KNOWLEDGE, SKILLS & ABILITIES:
* Required experience (one or more of the following)
* ASEET – preferred
* ASMET
* Six years military experience in a related field
* Equivalent industry experience
* Job progression requirements
* Minimum 5 years as a CE IV or Project Management experience
* Product certifications and field knowledge assessment up to date in
accordance with job level (refer to job progression chart)
* Meet all aspect of your current job description
* Interpersonal Skills
* Professional
* Reliable
* Team Player
* Mastery of electrical / electronic test equipment and theory
* Must be able to read and interpret electrical one-line diagrams and
blueprints
* In all aspects of the job, need to lead by example, and held to a higher
standard of conduct
* Product certifications up to date
* Meet all aspects of the job description
* Performance evaluation rating of meets all aspects of job requirement or
better
* Consistent performance and customer relation skills
* Technical skills
* Ability to make an immediate site evaluation, skills to include:
environmental temperature, and general operating conditions without
supervision
* Ability to summarize and report all work related tasks performed
* Ability to give technical assistance via the telephone to customers on a
regular basis
* Provide phone or on-site technical support to junior level associates
* Independently evaluate, recognize and recommend acceptable customer
solutions based upon site evaluation
* Recommend and direct activities at a customer site by leading technical
activities of other technicians
* Provide on-site customer consultation, must be able to present themselves
as an expert in the field
* Capable of providing project leadership and on-site direction for assigned
projects
* Provide expert site evaluation for Liebert Power Products and related
systems
* Assist Liebert Engineering and National Tech Support with site evaluations,
site visits, and recommendations/solutions as required
* Expert in site acceptance testing procedures and equipment
* Strong skill sets:
* Strong communication skills
* Ability to communicate with all levels within the customer organization
* Strong verbal communication
* Excellent written skills
* Able to manage stressful situations
* Diplomacy
* Troubleshooting skills
* Safety procedures
* Strong organizational and planning skills
* Excellent time management ability, capable of working without direct
supervision
* Computer skills
* Advanced word processing, report generation
* Spreadsheet processing
* Electronic mail
* Test equipment and data analysis programs
* Familiarity with computer networks
* Mechanical aptitude
WORKING CONDITIONS:
* Minimum of 90% domestic travel is required.
* International travel as directed by Power Technical Support or Field
Operations
* Hour/Day on-call availability through a national paging system
* Flexible schedules (weekends, evenings, and holidays)
* Valid driver’s license
* Valid U.S. passport required
* Deployable in the event of emergencies
PHYSICAL REQUIREMENTS:
While performing duties of the above jobs, the associate is regularly required
to stand, walk, use hands and fingers, handle or feel objects, tools or other
components; reach with hands and arms; stoop, kneel, crouch, or crawl; talk,
hear and smell. The associate frequently is required to sit and climb or
balance. Specific vision abilities required by this job include close vision,
distant vision, color vision, peripheral vision, depth perception, and the
ability to adjust focus. Must be able to consistently lift up to 50 pounds and
occasionally up to 75 pounds.
Notes: Vertiv will make reasonable accommodations whenever necessary for all
qualified employees or candidates with disabilities (as defined by applicable
law), provided that (1) the individual is otherwise qualified to safely perform
the essential functions of the job and (2) such accommodations due not impose an
undue hardship.
THE VERTIV OPPORTUNITY
The successful candidate will embrace Vertiv's Core Principles & Behaviors to
help execute our Strategic Priorities.
Our Core Principles: Safety | Integrity | Respect | Teamwork | Inclusion
Our Strategic Priorities
* High-Performance Culture
* Customer Focus
* Operational Excellence
* Innovation
* Financial Strength
Vertiv Behaviors
* Own it
* Act with urgency
* Foster a customer-first mindset
* Think big and execute
* Lead by example
* Drive continuous improvement
* Learn and seek out development
* Promote transparent & open communication
#LI-DR1
The successful candidate will embrace Vertiv’s Core Principles & Behaviors to
help execute our Strategic Priorities.
OUR CORE PRINCIPLES: Safety. Integrity. Respect. Teamwork. Inclusion.
OUR STRATEGIC PRIORITIES
• High-Performance Culture
• Customer Focus
• Operational Excellence
• Innovation
• Financial Strength
VERTIV BEHAVIORS
• Own it
• Act with urgency
• Foster a customer-first mindset
• Think big and execute
• Lead by example
• Drive continuous improvement
• Learn and seek out development
• Promote transparent & open communication
About Vertiv
Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing
services to enable its customers’ vital applications to run continuously,
perform optimally and grow with their business needs. Vertiv solves the most
important challenges facing today’s data centers, communication networks, and
commercial and industrial facilities with a portfolio of power, cooling and IT
infrastructure solutions and services that extend from the cloud to the edge of
the network. Headquartered in Westerville, Ohio, USA, Vertiv employs around
34,000 people and does business in more than 130 countries. Visit Vertiv.com to
learn more.
Work Authorization
No calls or agencies please. Vertiv will only employ those who are legally
authorized to work in the United States. This is not a position for which
sponsorship will be provided. Individuals with temporary visas such as E, F-1,
H-1, H-2, L, B, J, or TN or who need sponsorship for work authorization now or
in the future, are not eligible for hire.
Equal Opportunity Employer
Vertiv is an Equal Opportunity/Affirmative Action employer. We promote equal
opportunities for all with respect to hiring, terms of employment, mobility,
training, compensation, and occupational health, without discrimination as to
age, race, color, religion, creed, sex, pregnancy status (including childbirth,
breastfeeding, or related medical conditions), marital status, sexual
orientation, gender identity / expression (including transgender status or
sexual stereotypes), genetic information, citizenship status, national origin,
protected veteran status, political affiliation, or disability. If you have a
disability and are having difficulty accessing or using this website to apply
for a position, you can request help by sending an email to help.join@vertiv.com
[help.join@vertiv.com]
Required Skills
Related Jobs
Senior Commissioning Manager I - Data Center Construction
Mortenson · Amarillo, Texas
$159k–$238k / annually
Critical Facilities Technician - Data Center (2nd Shift)
Wesco · South Windsor, Connecticut
$37–$43 / hourly
Datacenter Site Leader + Thermal + AC Power - Phoenix Az
Vertiv · Phoenix, Arizona